>

Enter Your Email To Sign Up
For Our E-Newsletter:



  Home > Anti-Friction Bearings > Linear Motion Bearings > Ballscrews >

500MM long lead screw and a nut
500MM long lead screw and a nut


 
Alternative Views:


Our Price: CA$50.91


Product Code: 500MM-LONG-LEAD-SCREW-NUT
Qty:

Description
 
500MM long lead screw and a nut

End
End

500MM long lead screw and a nut

  • Item: Leadscrew
  • Type: Lead screw + a NUT
  • Length: 5000mm
  • Material: 304 Stainless Steel
  • Screw Pitch (lead): 2mm
  • Diameter: 8mm
  • Quality:High speed operation and durability
  • Quantity: One leadscrew+One Nut

500MM long lead screw and a nut


500MM-LONG-LEAD-SCREW-NUT


Share your knowledge of this product. Be the first to write a review »

Bearings Canada

Copyright ©  Bearings Canada .com. All Rights Reserved.

Built with Volusion.